Herunterladen Inhalt Inhalt Diese Seite drucken

Keypad; Power Supply; Set Up / Multi-Functional Mount - geo-FENNEL FLG 40-PowerCross GREEN SP Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

KEYPAD

1.
ON/OFF LED
2.
ON/OFF horizontal and vertical laser line

POWER SUPPLY

Put in 3 x AA Alkaline batteries into the battery case (4) (take care to polarity) and
close battery compartment.

SET UP / MULTI-FUNCTIONAL MOUNT

Fix the instrument on the multi-functional mount by using the 1/4" adapter.
To move the instrument up or down on the mount declamp the knob (7).
For locking the desired position of the instrument tighten the knob again.
Use of the laser on a tripod.
Use of the laser with the magnets.
Use of the laser with strap attachment.
1
2
EN
C
D
E
13

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis