INSTALLATION INSTRUCTIONS

The stove is designed with rear flue connection. The stove is delivered with two flue connections allowing
both direct horizontal connection and vertical connection. Selected flue connection shall be screwed tightly
tigtly to the outlet on the rear side of the stove with two M6 screws and nuts.
In case of direct (horizontal) connection, only part no. 119 will be installed, while in case of vertical
connection parts 117, 118, 119 – Figure 6, page 74 – should be installed subsequently. The stove is
delivered complete with a bag containing all necessary screws and nuts.
Install the front plinth (104) as shown on the figure on the cover page.
A spring may be installed on the lower hinge of the stove door to make sure that the door will not remain
open, except when firing or refuelling.
Figure 1
To install the spring, proceed as follows:
-Close the door, remove the front plinth, remove the pin from the lower hinge, insert the screw to
protrude some 15 mm from the hinge. Fix the spring onto the screw and pull it at one end to engage the door
edge. While holding the spring in the position, press the screw down and fix it with the nut (see Figure 1).
Enable access on the back of the fuel fireplace because of maintenance (on the connection of the
conduits of the central heating with the cattle).
The installation of the thermal product must be in compliance with all current norms and provisions as
well as with applicable laws. Fitting, connecting, putting into operation and testing for proper operation must
be carried out in accordance with the professional rules by authorised professionals while fully observing
the current norms at the national, regional and municipal levels of the country where the device is being
fitted. Fitting may be performed only by authorised professionals who are required to issue a completed and
verified certificate/work order to the customer. The customer is required to keep such certificate/work order
and present it to the manufacturer at its request as the proof that the installation of the thermal product was
carried out by an authorised professional.
The company Plamen d.o.o. will not be held responsible in case of breaching the above and will
not be liable for any difficulty in the operation of the product and cost arising from this if the thermal
product was not installed by an authorised professional.
Connecting the boiler into the central heating system
The boiler has to be connected into the central heating system with open expansive container so that, in
case of over-heated water, there would be no elevation of pressure in the system (illustration 1). We suggest
installation of a 4-tine mixer (so-called 'mouse valve') which allows regulation of temperature of the boiler
water and secures it to be hot enough (60 – 70°C) in order to avoid boiler perspiration and prevent low-
temperature corrosion. A thermostat can be installed instead of 'mouse valve' with its sensor on the flow
pipe. The thermostat engages the pump only when the water reaches sufficient temperature in the boiler
and the flow pipe. Illustrations 1 and 2 show connection of boiler into the central heating system.