4. Then, choose whether the battery status shall be displayed in percent or in volts.
5.3.2 Use of battery charge display when operating with other batteries
5.3.2.1 Set-up of battery charge
The following set up steps are necessary before first commissioning:
Die folgenden Setup-Schritte sind vor der ersten Inbetriebnahme notwendig:
1. To enter the setup menu press the "setup" button.
2. Select the units in which the remaining range is displayed. Push the button in the center
of the display to select between kilometers, miles, nautical miles, and hours. You con-
firm your selection by pressing "setup" again.
3. Now, enter the speed indicator setting. You can choose between kilometers per hour,
miles per hour, and knots. Again you select the units with central button. Confirm your
selection by pressing "setup" again.
4. Then, choose whether the battery status shall be displayed in percent or in volts.
5. The next step is to supply the on-board computer with information about the batteries.
Start with entering whether the motor is connected with lithium batteries from the
Torqeedo power series or with lead-gel or AGM batteries. Select "Li" for lithium or
"Pb" for lead-gel or AGM batteries. Confirm your selection by pressing "setup" again.
6. Enter the size of the battery bank with which the motor is connected. For this enter
ampere-hours (Ah) for the battery bank. Please use the throttle lever to select the correct
number of ampere-hours. Pushing the "setup" button will confirm your selection and
exit the setup-menu. Please note that for instance a battery bank consisting of two seri-
ally connected batteries of 12 volt and 200 Ah each has a total capacity of 200 Ah with 24
volt (not 400 Ah)
The capacity in percent and the remaining range can only be displayed after completing
the setup and after the first calibration (entering the charge level, see capter 5.3.3.2).
72