Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Technical data

Initial Use
WARNING:
Important!
Fill the reservoir and flush it out until water discharges from all hot water
taps, otherwise the temperature sensor and retainer will be damaged
and require replacing.
During heating, displaced water must drop from the discharge
of the safety valve (closed operation) or out of the mixer tap
(open operation). Monitor the first heating cycle.
Maintenance
In order to avoid hazards, repairs may only be carried out by
a customer service operator licensed by us.
The initial service through our customer service operator should take
place around two years after the first operation. At this time, the device
will potentially be decalcified. Afterwards, the customer service
5
Technical data
TR5500T 30 EB
Volume
Weight when full
Maximum operating pressure
Degree of protection
Water connection
Time taken to heat to approx. 85 °C,
at a cold water supply temperature of 15 °C
TR5500T 30 EB
Energy class
Load profile
Power consumption yearly in kWh
Power consumption daily in kWh
Sound power level in dB
Warm water efficiency in %
Mixing water at 40 °C (Thermostat Temperature 60 °C)
Double-power operation
Current limits
Secure base load
(min. xx A)
Secure max. load
(max. xx A)
Single-power operation
Current limits
Secure load
12
operator will recommended a date for the next service. Specify the E-No.
and FD-No. when phoning the customer service operator!
Decalcification
Before decalcification the device must be emptied. Without placing
stress on the device, draw hot water until cold water comes. Then, close
the shut-off valve on the intake, open the hot water valves on all
connected fittings and empty the device via the safety valve. A few litres
of water will remain in the device. To empty completely, loosen the
two screws on the cover and remove the cover (Diagram 12). Unscrew
the fastener "b" of the discharge connecting piece (Diagram 14), the
remaining water flows away.
Decalcify the device. The specially enamelled steel reservoir and
the protection anode are not to come into contact with the decalcifier,
do not work with a pump! Remove heater and de-calcify, clean discharge
pipes mechanically and remove remaining lime.
In an open operation, a valve can be fitted between the fitting and cold
water intake of the reservoir to aid emptying.
1/N/PE~230 V
2/N/PE~230 V
1/N/PE~230 V
1 kW
2 kW
3 kW
2/N/PE~230 V
1 kW
2 kW
3 kW
litres
kg
MPa (bar)
Hours
1 kW
2 kW
3 kW
(kWh)
(kWh)
(dB)
(%)
(I)
1 - 3 kW 1/N/PE~230 V min 10 A // max 16 A
2 - 3 kW 1/N/PE~230 V min 10 A // max 16 A
1 - 3 kW 2/N/PE~400 V min 10 A // max 16 A
2 - 3 kW 2/N/PE~400 V min 10 A // max 16 A
1 kW 1/N/PE~230 V // 1 x min 10 A
2 kW 1/N/PE~230 V // 1 x min 10 A
3 kW 1/N/PE~230 V // 1 x min 16 A
1 kW 2/N/PE~400 V // 2 x min 10 A
2 kW 2/N/PE~400 V // 2 x min 10 A
3 kW 2/N/PE~400 V // 2 x min 16 A
TR5500T – 6 720 875 994 (2017/12)
30.0
49
0.6 (6)
IP 25D
G1/2A
2.8
1.5
1
B
S
525
2.480
15
35.1
40

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Tr5500t 30 eb

Inhaltsverzeichnis