Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Outline diagram

Installation to be done in accordance with the diagram
below. Install the pipes such that vibrations from the
heat pump are not transferred to the cooling module
and beyond via the pipes.
NK
AV
SÄV
AV
PKM
B
E
SV
D
KB-in
KB-ut
BK/JK
SÄV
EXP
VVB/ACK
C
FIGHTER 1240
Abbreviations
AV
Shutoff valve
BK/JK
Rock collector/Soil collector
EXP
Expansion vessel
FG
Flow sensor
KB-in
Brine in
KB-out
Brine out
NK
Level vessel
SV
Mixing valve
SÄV
Safety valve
VVB/ACK
Accumulator with hot water heater
PKM 05
GB
11

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis