ATTENTION!
>
The lifting unit is now operational
>
Plug in the unit and carry out a function test. Allow water to flow into the tank.
The lifting unit turns on as soon as the electrical power supply is established
and the water level in the tank is above the switch on level
>
Check all connections/pipe lines for leaks
>
In addition, observe the specifications in DIN EN 12056-4, DIN EN 12050-3 and
DIN 1986/100
ATTENTION!
Before carrying out any maintenance work on the unit, all power lines should be
disconnected from the mains and care should be taken that the unit cannot be
inadvertently switched back on. Check the pressure line for damage.
Change the active charcoal filter:
>
At least once a year
>
In case of unpleasant odours
>
Where water has discharged through the filter
In case of decreasing pump performance remove possible deposits and other
substances from the tank.
In addition, observe the specifications in DIN EN 12056-4, DIN EN 12050-3 and
DIN 1986/100. In case of problems, please contact your CONEL supplier.
This kit is required for installation of the lifting system behind a front wall if venti-
lation via the roof through an independent vent line is not possible/economical.
It contains all required parts to install the breather and vent with active charcoal
filter on the front wall.
KBN: ABSVIS
Commissioning | Maintenance | ABS front wall installation kit

10. Commissioning

11. Maintenance

12. ABS front wall installation kit