Herunterladen Inhalt Inhalt Diese Seite drucken

Unpacking; Before Commissioning & Installation - Scheppach Gp1100 Original Bedienungsanleitung

Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

Noise
The noise levels have been determined in accordance
with EN 3744:2010.
Sound power level L
wA
Uncertainty K
pA/wA
m Warning: Noise can have serious effects on your
health. If the machine noise exceeds 85 dB, please
wear suitable hearing protection.
7.

Unpacking

• Open the packaging and carefully remove the de-
vice.
• Remove the packaging material, as well as the pack-
aging and transport safety devices (if present).
• Check whether the scope of delivery is complete.
• Check the device and accessory parts for transport
damage. In the event of complaints the carrier must
be informed immediately. Later claims will not be
recognised.
• If possible, keep the packaging until the expiry of the
warranty period.
• Familiarise yourself with the product by means of the
operating instructions before using for the first time.
• With accessories as well as wearing parts and re-
placement parts use only original parts. Replace-
ment parts can be obtained from your dealer.
• When ordering please provide our article number as
well as type and year of manufacture for your equip-
ment.
m WARNING!
The device and the packaging material are not
children's toys! Do not let children play with plas-
tic bags, films or small parts! There is a danger of
choking or suffocating!
8.
Before commissioning & installation
• Prior to commissioning, all covers and safety devic-
es must be mounted correctly.
• Before connecting the machine, make certain that
the data on the type plate matches with the mains
power data.
Note:
A 1-inch internal thread serves as the connection for
the suction and pressure connection at the factory.
Additional connection system (such as tap piece, hose
clamp, bayonet fitting) is required for installation and is
83.73 dB
not included in the scope of delivery.
1.64 dB
8.1
Installing the foot (6) and the carrying handle
(7) (Fig. 2, 3)
1.
Screw the supplied foot (6) into the thread located
on the underside.
2.
Place the carrying handle (7) in the intended space
and screw it with the enclosed screws M6x30.
8.2
Installation of a suction line (Fig. 4)
1.
Remove the sealing cap (3a) on the suction con-
nection (3). Keep the sealing cap (3a) in a safe
place!
2.
Connect the appropriate connection system
(such as quick coupling system, bayonet fitting)
to the suction connection (3).
3.
Then connect the suction line with the appropri-
ate connection system (such as quick coupling
system, bayonet fitting).
4.
Lay the suction line rising from the water pick-up
point to the garden pump.
Notes:
• Please do not lay the suction line above the pump
height. Air bubbles in the suction line will delay and
prevent the suction process.
• Attach the suction and pressure lines so as to avoid
mechanical pressure on the garden pump.
• Place the suction line deep enough in the water to
prevent the garden pump from running dry due to the
water level sinking.
• Check the suction hose for leaks, to avoid sucking
air.
• Avoid sucking in foreign bodies (sand etc.).
8.3
Filling the garden pump with water (Fig. 5)
To reduce the start-up time of the garden pump and
to prevent air from being sucked in, the garden pump
must be filled with water beforehand!
1.
The suction line should already be fitted for this
purpose to prevent water from flowing out of the
suction connection (3).
2.
Fill the garden pump with water via the opening of
the pressure connection (1). Alternatively, water
can be poured in through the opening of the filler
plug (2). Approx. 2.5 litres of water are required.
www.scheppach.com
GB | 21
Inhaltsverzeichnis
loading

Diese Anleitung auch für:

5909406917

Inhaltsverzeichnis