Herunterladen Inhalt Inhalt Diese Seite drucken

Performing Tests - Sentiotec Time4Wellness K2 Next Installations- Und Gebrauchsanleitung

Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

Installation instructions, only for experts
Fig. 2

4.5. Performing tests

The following tests must be performed by a certified electrical fitter.
WARNING!
The following tests must be performed with the power supply
switched on. There is a danger of electric shock.
● NEVER touch live parts.
1. Check the contact of the earth conductors on the earth conductor terminal.
2. Check the safety shut-off.
a. Switch on the control unit.
► The control light must be permanently on.
If the control light flashes, continue from point 5. Troubleshooting
for the installer.
WORLD OF WELLNESS
1
Heater sensor half-shells
2
Connection panel
3
Cross-head screws (9 mm)
4
Heater sensor
5
Heater sensor wires
6
Wood screws (16 mm)
p. 13/26
EN

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Time4wellness k2-9-n

Inhaltsverzeichnis