Herunterladen Inhalt Inhalt Diese Seite drucken

Devon & Devon Angel Console Montageanleitung Seite 15

Inhaltsverzeichnis
Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 18
7)
Rest the Cambridge basin
(F)
n the structure, adjusting
as necessary to obtain a good
position on the structure and in
relation to the wall.
9)
After finding the best possible
position, put the S-brackets (G)
into place under the basin.
Mark the points (2 for each bracket)
where holes need to be drilled to fix them.
8)
If necessary, regulate the
adjustable supports to obtain
a better result. Use a level to
check the basin is correctly
positioned on the structure.
10)
Once this is done, mark
the holes for fixing the metal
structure to the wall.
14
Inhaltsverzeichnis
loading

Inhaltsverzeichnis