Safety Instructions and EU Declaration of Conformity:
• This „Instruction manual" has to be kept on the place, which can be easy reached .
• The regulator has to be used only for dry and clean gases . Never use with oxygen: risk of explosion.
• The national norms and standards about installation, start-up and maintenance of the devices and gas
installations have to be strictly respected .
• The handling with the device has to be done carefully, specially by the installation works . The pick up has
to be made by using the stretcher eyes or belts .
• The device should be examined before the installation for possible transport damages and be mount-
ed only if it is in perfect state . Possible lacquer damage should be improved . The sealing surfaces of the
threaded connections or flanges must be damage-free and clean .
• For reading off the device and its serving are sufficiently space to designate .
• For the protection of the device is recommendable to install a filter .
• The device is to be installed in such a way that it is not impaired in its function by other installation com-
ponents .
• The regulator has to be mounted in the pipe line without any tension .
• The mentioned below torque's values for screws (property class 5 . 6 ) must be respected by tighten of the
flanged connections:
PN 16
ANSI 150
• These torque's values are mentioned per screw and are valid for metal soft material gaskets (speci-
fied as k0xKD=45bD und k1=2,2bD). Other gaskets can require another torque's values.
• The screws used for the flange connection must be according to the flange size and must be adapted to
the temperature range of the regulator . Please tighten the screws crosswise .
• After the installation works are completed, the tightness of the connections (threaded or flanged) must be
checked with appropriate means .
• The operating conditions indicated on the name plates must be respected; if necessary appropriate safety
devices have to be designated .
• Repairs of the device are allowed to be made only by trained or qualified personal . Afterwards a tightness
test with 1 . 1 X PS must be performed . When changing pressure containing parts their compliance with
PED must be assured . After guarantee only with repair by Itron .
• The device has to be regularly examined for corrosion danger in the interior and external area and be taken
from use if noticeable corrosion is discovered .
Size
Type
8N
V in litres
6,4
• The inner chamber volume of the RR 16 regulator amounts to::
• The cleaning of the devices has to be done without using any alcohol containing solvent or cleaning
agents .
• The device is not appropriate for floods and loads by earthquakes .
• The pressure has to be completely discharged before to take the device from the pipe line . The rest of gas
can withdraw; therefore the required ventilation has to be insured .
• The appropriate measures for noise reduction have to be seized depending on the installation place and
work conditions .
22
DN 25
35Nm
(M12)
40Nm
(
/
-13 UNC)
1
2
25
8H
12N
7,4
10,6
DN 50
85Nm
(M16)
85Nm
(
/
-11UNC)
5
8
50
8N
8H
7
8
DN 80
85Nm
(M16)
85Nm
(
/
-11UNC)
5
8
80
12N
8N
13,6
10
8H
11