Transport
For the transport by means of a hand truck or boiler trolley, posi-
tion the latter under the front end of the unit below the transport
security device.
For transport on a level surface, the unit can be lifted from the
rear or from the front by means of a lift truck or forklift. In this
case, the transport securing device is not imperative.
ATTENTION!
The heat pump must not be tilted more than max. 45° (in either direction).
After the transport, the transport securing device is to be re-
moved on either side at the bottom of the unit.
ATTENTION!
The transport securing device is to be removed prior to commissioning.
To remove the panelling, open the individual covers by unscrew-
ing the respective turn-lock fasteners and then gently tilting the
covers away from the device. Then lift them up out of the mount-
ings.
www.dimplex.de
6
Installation
6.1 General Information
The brine-to-water heat pump must be installed in a frost-free,
dry room on an even, smooth and horizontal surface. The entire
frame should lie directly on the floor to ensure an adequate
soundproof seal. Failing this, additional sound insulation meas-
ures may become necessary.
The heat pump should be installed to allow easy maintenance/
service access. This is ensured if a clearance of approx. 1 m in
front of the heat pump is maintained.
Neither frost nor temperatures higher than 35°C must occur in
the installation location at any time of the year.
6.2 Attaching the heat pump
If the heat pump is installed in areas prone to earthquakes, use
the enclosed fixing brackets to obtain a stable connection to the
foundation. These fixing brackets are firmly screwed to the base
of the heat pump and the foundation.
The bore holes in the foundation should be made before install-
ing the heat pump. For the exact position, see dimension drawing
Four threads are also available on the top side for screwing with
the fixing equipment to be created on-site. The device must not
be lifted via these threads.