The thick needle(0.5mm) must match with both Nozzle and Nozzle Cap
with siping, the thin needle(0.3) match with Nozzle and Nozzle Cap without
siping. Before assembly #4 Nozzle and #6 Needle, we have to try them first,
the pinhead must out of Nozzle head, otherwise, we must change Nozzle
or Needle.
I. INSPECTION AND MAINTENANCE
Compressor
Note: These procedures are in addition to the regular checks and
maintenance required to operate the compressor and other air-operated
tools.
1. BEFORE EVERY USE, inspect the general condition of the compressor.
Check for:
- loose screws,
- misalignment or bending of moving parts,
-damaged air supply hose,
- cracked or broken parts,
- any other condition that may affect its safe operation.
2. AFTRE EVERY USE
a. Drain the water trap.
- With the compressor running, drain the moisture by loosening the nut at
bottom of the drain valve. The moisture will be forced out.
- Turn off and disconnect the compressor from its power source.
- Close the drain valve.
b. Wipe the compressor with a piece of clean cloth.
Airbrush
Note: These procedures are in addition to the regular checks and
- 13 -