Herunterladen Inhalt Inhalt Diese Seite drucken

Attaching The Cable-Management Arm Retainer; Replacing The Rack Doors - Dell PowerEdge 2900 Installationsanleitung

Rack
Vorschau ausblenden Andere Handbücher für PowerEdge 2900:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 46

Attaching the Cable-Management Arm Retainer

The cable-management arm retainer keeps the cable-management arm in place. To attach the cable-
management arm retainer:
1 Connect the release latch on the cable-management arm retainer to the tab on the outer slide
assembly. See Figure 1-10.
NOTE:
Attach the cable-management arm retainer to the side opposite of where you attach the cable-management
arm (see Figure 1-10).
2 Fold the cable-management arm retainer until it locks into place behind the cable-management arm.
To unlock the cable-management arm retainer:
1 Press the blue button on the cable-management arm retainer while lifting the retainer arm.
2 Rotate the arm of the retainer to an open position.
Figure 1-10. Cable-Management Arm Retainer
1
release latch on cable-
management arm retainer
4
metal tab

Replacing the Rack Doors

See the procedures for replacing doors in the documentation provided with your rack cabinets.
This completes the rack installation of your system.
20
Rack Installation Guide
back of system
2
cable-management arm retainer
2
1
4
3
blue button
3

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis