Herunterladen Diese Seite drucken

Westermann Cleanmeleon 2 PRO Betriebsanleitung Seite 114

Vorschau ausblenden Andere Handbücher für Cleanmeleon 2 PRO:

Werbung

7
Assembly, first start-up
7.1
Sicherheit
NOTICE
7.2
Assembly
The complete assembly and first start-up is carried out exclusively by the
manufacturer. The machines are subjected to a thorough test run and are
supplied only after successful acceptance.
7.3
First start-up
NOTICE
26
To ensure the safety of man and machine, easy and
risk-minimised installation/handling was taken into
consideration during construction. Thus, the handling
unit is subject to all applicable DIN EN standards.
Operator training and instruction are required and
further reduce the safety risk.
Before first start-up, check the entire vehicle for
possible damage.

Werbung

loading