6.4
Filling of a system after evacuation
Disconnect the hose from the vacuum pump and screw it to
the refrigerant cylinder or cylinder.
Filling process according to the instructions of the plant or
compressor manufacturer
If liquid is filled at less than 5.2 bar, there is a risk of dry ice
formation!
To check the correct capacity, REFCO recommends using the
REFSCALE filling scale.
After reaching the filling quantity, close the valves of the
assembly aid.
Disconnect all hoses from the system
Open valves (6+7)
10
Instruction Manual