Herunterladen Diese Seite drucken

Buderus Logafix BUE-Plus-2 Einbau- Und Betriebsanleitung Seite 28

Heizungspumpe

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
English
• Mains connection: L, N, PE.
• Max. back-up fuse: 10 A, slow-blow.
• Earth the pump in accordance with instructions.
Dismantle the plug in accordance with Fig. 5. A screwdriver
is required to do this.
• The electrical connection is to be established via a fixed
connecting cable equipped with a connector device or an
all-pole switch with a contact opening width of at least
3 mm.
• To ensure drip protection and strain relief at the PG
screwed connection, a connecting cable with an adequate
outer diameter is required (e.g. H05VV-F3G1.5).
• For pumps in systems with water temperatures above
90 °C, install a suitably heat-resistant connecting cable.
• The connecting cable is to be laid in such a way that it can
under no circumstances come into contact with the pipe
and/or the pump and motor housing.
• The switching of the pump using triacs / solid-state relays
must be tested on a case-by-case basis.
CAUTION:
• Only operate the pump with sinusoidal AC voltage as
stated on the rating plate.
• The switching of the pump using triacs / solid-state
relays must be tested on a case-by-case basis.
• Voltage pulsing during phase angle control or external
control cause damage to electronic components.
24

Werbung

loading