Herunterladen Diese Seite drucken

Panasonic TY-ST85PB1 Montageanweisungen Seite 31

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 34
2. Align the positions of the upper and
lower holes of the earth brackets ⑧ with
the temporarily tightened earth bracket
attachment screws Ⓖ, and hook the earth
brackets ⑧ onto the screws.
3. Push the earth brackets ⑧ towards the
display, and align the earth bracket ⑧
holes (center) with the holes (center) on
the mounting brackets.
* Ensure the gasket on the front of the earth
brackets is touching the display.
4. Attach and firmly tighten the earth bracket
attachment screws Ⓖ to the aligned holes
(center).
5. Tighten the upper and lower earth bracket
attachment screws Ⓖ.
Assemble the right side in the same way.
Note
Firmly tighten the screws to the tightening torque shown
below. (1.2 to 1.5N·m)
5. Wiring
Fix the clampers ⑥ (4) to the side
of the lower part of the mounting
brackets (left/right).
Wire the cables by inserting
them into the wiring guides on
the back of the right and left
support columns. Then attach
the stoppers ⑦ (6) to the wiring
guides with the stopper attachment
screws Ⓔ (6).
Each of the right and left wiring
guides has 6 screw holes for the
stopper attachment screws. Use
the screw holes appropriate for
your wiring.
(Tightening torque: 1.2 to 1.5 N·m)
Important
Do not bundle the connection cables
and main lead together.
Gasket
Clamper ⑥
Holes for inserting clampers
Stopper ⑦
Wiring guide
Cables
Mounting bracket
Upper
Center
Lower
Earth bracket attachment screws Ⓖ
Stopper ⑦
Stopper
attachment
screw Ⓔ
Earth bracket ⑧
Cables
Stopper
attachment
screw Ⓔ
31

Werbung

loading