Herunterladen Diese Seite drucken

KERN&SOHN KFP V40 Serie Installationsanleitung Seite 31

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6.4 Levelling
Accurate weighing results require a platform with perfect horizontal alignment. During
initial installation and after each change of work area it is necessary to level the
platform.
6.5 Connecting a display unit
Before any installation work, disconnect the appliance from the operating
voltage.
Put the connecting cable to the display unit in a manner that it is protected
against damage.
Connect the platform to the display unit according to the following table.
Output load cell
EXC+ (5V)
EXC- (0)
SIG-
SIG+
SEN+
SEN-
7 Operation
Information about
• Mains connection
(power is supplied via the connecting cable of the display unit)
• Initial Commissioning
• Connection of peripheral appliances
• Adjustment, linearization and verification
(only the complete balance is verifiable, i.e. platform in conjunction with a
suitable display unit)
and the correct operation you will find in the operating instructions included in the scope
of delivery of the display unit.
TKFP-V40-A-IA-def-2310
 As the air bubble is located under the weighing plate,
remove it.
 Align the platform with the adjustment feet until the
air bubble of the water balance is in the prescribed
circle.
Connection of platform KERN KFP
see labelling of load cell
11

Werbung

loading