Herunterladen Diese Seite drucken

Victron energy MPPT 100/15 Anleitung Seite 8

Vorschau ausblenden Andere Handbücher für MPPT 100/15:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 27
3.7 Battery charging information
The charge controller starts a new charge cycle every morning, when the sun starts shining.
The maximum duration of the absorption period is determined by the battery voltage
measured just before the solar charger starts up in the morning:
Battery voltage Vb (@start-up)
23,8V < Vb < 24,4V
24,4V < Vb < 25,2V
(divide voltages by 2 for a 12V system)
If the absorption period is interrupted due to a cloud or due to a power hungry load, the
absorption process will resume when absorption voltage is reached again later that day,
until the absorption period has been completed.
The absorption period also ends when the output current of the solar charger drops to less
than 1 Amp, not because of low solar array output but because the battery is fully charged
(tail current cut off).
This algorithm prevents over charge of the battery due to daily absorption charging when
the system operates without load or with a small load.
3.8 VE.Direct communication port
Several parameters can be customized (VE.Direct to USB cable, ASS030530000, and a
computer needed). See the data communication white paper on our website.
The required software can be downloaded from
http://www.victronenergy.nl/support-and-downloads/software/
The charge controller can be connected the to a Color Control panel, BPP000300100R, with
a VE.Direct to VE.Direct cable.
6
Vb < 23,8V
Vb > 25,2V
Maximum absorption time
6h
4h
2h
1h

Werbung

loading