Herunterladen Inhalt Inhalt Diese Seite drucken

FUAVE Reykjavik 700 Bedienungsanleitung Seite 46

Infrarot-heizung
Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

To mount the appliance onto the wall:
1. Select a suitable place for use that satisfies the following points:
• Sufficient space around the infrared panel in connection with ventilation:
Left and right at least 10 cm free space.
-
At the top, at least 50 cm free space
-
At the bottom, at least 15 cm or more free space.
-
At the rear, at least 2 cm free space.
-
At the front, at least 50 cm free space.
-
• The ventilation openings are not blocked.
• At least 60 cm away from water sources.
• Not near:
Curtains
-
Hobs or other heat sources
-
Flammable materials
-
Shower cubicle, bath or sink
-
• Make sure the control panel and other controls of the appliance cannot be reached from the bath or shower.
• Hang as far away as possible from television and radio equipment.
• The socket to be used supplies the voltage on the appliance's type plate (230V~50Hz).
• The power socket can be reached with the plug and the power cable is not stretched.
2. Mark off the four mounting holes for the wall bracket
wall:
A. Place the wall bracket on the wall and use a spirit level to
check that the wall bracket is horizontal.
B. Mark off the holes on the wall with a pencil.
3. Drill the holes with the 8 mm drill.
ATTENTION!
Do not drill the holes through the wall bracket. This
damages the wall bracket.
46 FUAVE Reykjavik 700/900
L
on the
L
Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Reykjavik 900

Inhaltsverzeichnis