Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Of The Appliance: Fixation To The Wall - Fuave Reykjavik 700 Bedienungsanleitung

Infrarot-heizung
Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

D. Place the infrared panel
E. Align the bottom two holes in the infrared panel
with the two holes of the standard. Attach the standard
to the infrared panel with the two screws for the
supports O.
ATTENTION!
Do not over-tighten the screws
for the supports.
3. Place the batteries in the remote control (see 'Replacing the batteries in the remote control').
4. Fully roll off the power cable of the appliance and lay the power cable so that it cannot touch hot parts of the
appliance.
The appliance is now ready for use. Insert the plug in the socket. Continue with the 'Connecting the remote control to
the appliance' section.
!
RISK OF TRIPPING!
Lay the power cable outside the walking route. Make sure that the power cable cannot be stepped on and that
no furniture or other items are placed on it.
RISK OF FIRE! Always place the power cable along the back of the appliance and never along the front.

3.3.2. Installation of the appliance: fixation to the wall

Tools required:
• Level
• Drill with 8 mm drill
• Crosshead screwdriver
• Pencil
USER MANUAL
A
in the standard.
A
A
A
O
45
Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Reykjavik 900

Inhaltsverzeichnis