16.1 Power supply connection
17.
START
All the starting operations must be performed with the cover of the EVOSTA2 SOL
control panel closed.
Start the system only when all the electrical and hydraulic connections have been
completed.
Avoid running the circulator when there is no water in the system.
As well as being at a high temperature and pressure, the fluid in the system may also
be in the form of steam. DANGER OF SCALDING!
It is dangerous to touch the circulator. DANGER OF SCALDING!
Once all the electrical and hydraulic connections have been made, fill the system with water and if necessary
with glycol (for the maximum glycol percentage see par. 4) and feed the system.
Once the system has been started it is possible to modify the operating modes to adapt better to the plant
requirements (see par.Error! Reference source not found.).
ENGLISH
Connect the connector to the pumpa.
Figure 16
53