Herunterladen Diese Seite drucken

DAB EVOSTA2 Installationsanweisung Und Wartung Seite 43

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 90
9.1
Power supply connection
Phase
Unscrew the cable gland nut
and extract the terminal
board from the connector,
Action
releasing it from the side
clips.
Illustration
Phase
Insert the wired terminal
board in the cable gland,
Action
securing it with the side
clips. Screw on the locking
nut.
Illustration
ENGLISH
EVOSTA3
1
Rotate the terminal board
through 180°.
4
Connect the wired
connector to the pump,
securing it with the rear
hook.
Table 4: Mounting the Evosta3 connector
41
2
Fit nut and connector on the
cable. Strip the wires as
indicated in the figure.
Connect the wires to the
terminal board, respecting
the phase, neutral and earth
5
3

Werbung

loading

Diese Anleitung auch für:

Evosta3Evosta2 sol