Herunterladen Diese Seite drucken

DAB EVOSTA2 Installationsanweisung Und Wartung Seite 44

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 90
Phase
Unscrew the cable gland
Action
nut and extract the terminal
board from the connector.
Illustration
Phase
Insert the wired terminal
Action
board in the cable gland.
Screw on the locking nut.
Illustration
10.
START
All the starting operations must be performed with the cover of the EVOSTA2,
EVOSTA3 control panel closed.
Start the system only when all the electrical and hydraulic connections have been
completed.
Avoid running the circulator when there is no water in the system.
As well as being at a high temperature and pressure, the fluid in the system may also
be in the form of steam. DANGER OF SCALDING!
It is dangerous to touch the circulator. DANGER OF SCALDING!
ENGLISH
EVOSTA2
1
Remove the retaining screw.
4
Connect the wired connector
to the pump and tighten the
retaining screw.
Table 5: Mounting the Evosta2 connector
42
2
Fit nut and connector on the
cable. Strip the wires as
indicated in the figure. Connect
the wires to the terminal board,
respecting the phase, neutral
and earth.
5
3

Werbung

loading

Diese Anleitung auch für:

Evosta3Evosta2 sol