Herunterladen Inhalt Inhalt Diese Seite drucken

Simag SDN 25 Bedienungsanleitung Seite 41

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

PROCEDURE
1. Remove the Front Panel and....
2. ....Top Panel to again access either to the control
box and the evaporator.
3. Remove also the Bin Door.
4. Wait until the end of defrost cycle then Switch OFF
the machine at unit master switch.
5. Scoop out all the ice cubes stored into the bin in
order to prevent them from being contaminated with
the cleaning solution.
6. Flush out the water from the sump reservoir by
removing the over flow stand pipe.
PAGE 2/6

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis