Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance; Battery Maintenance / Replacement - Dehn PHE III Gebrauchsanleitung

Spannungsprüfer
Vorschau ausblenden Andere Handbücher für PHE III:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

9.

Maintenance

9.1
Open the housing (1) by truning the sealing ring (4) on the lower end of the indicator counterclockwise
(the insulating stick does not have to be removed) (see Fig. 9).
9.2
Remove the electronic element (3) from the housing (see Fig. 9).

Battery maintenance / replacement

9.3
Regularly check the condition of the batteries (e.g. every three months) and make sure that they have
not leaked. If lithium batteries are used, the test intervals can be extended.
Battery replacement (see Fig. 9):
Replace the 9V block battery (2) in the upper end of the electronics slide-in unit in the battery
compartment by a new one (observe battery symbols +/-).
The following batteries may be used: 9 V block batteries (IEC 6LR61), leak-proof, for example:
• Energizer Alkaline No. 522
• Panasonic XTREME POWER
• Duracell Alkaline Manganese MN 1604
• Kodak XTRALIFE Alkaline Manganese K9V
or
• Ultralife Lithium Cell U9VL
Used batteries must be disposed of in an environmentally-friendly manner.
5 Guide
Fig. 9
14
7 Red marking point
6 Guide slot
3 Electronic
element
5 Guide
8 "TEST" button
4 Sealing ring
Note
Ensure tight fit of the assembled
elements!
1 Housing
6 Guide slot
2 9 V block battery

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis