Herunterladen Diese Seite drucken

Hitachi PC-ARFH1E Bedienungsanleitung Seite 10

Vorschau ausblenden Andere Handbücher für PC-ARFH1E:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 21
Installation
Check the contents and the quantity of the accessories in the packing.
(ii) A - Remote control switch for operation control
B - 2 M4x16L screws for fixation of the holding bracket onto the wall or unit.
C -1 Instruction Manual
In case of installing multiple controllers in a vertical arrangement, a clearance of more than
50 mm shall be kept between controllers (iii).
2.1 INStallatION PrOCeDure
1 Insert the tip of a slotted screwdriver into the notches at the bottom of the holding
bracket, push and turn the slotted screw driver and then remove the holding bracket from
the remote control switch.
(iv) A - Notches
B - Approx. 6mm
C - Slotted screwdriver
2 Attach the remote control switch to the holding bracket and connect the cable as follows:
- In case of direct connection of exposed remote control cable
Fix the holding bracket onto the wall with screws (accessory).
Attach the stopper (plastic band) to the cable at the inner side of the draw-out hole.
(vi) B - Cable
C - Band stopper (Field-supplied)
D- Draw-out hole
- When using a switch box
i. Prepare a field-supplied implanted switch box (JIS C 8336-1988 type)
ii. Lead the cable through the conduit tube in the wall.
(vii) G - Implanted switch box (JIS Box) with 4 fixing tabs
H - Implanted switch box (JIS Box) with 2 fixing tabs
I - M4 screws (field-supplied)
iii. Peel the insulation at the end of the cable and clamp the M3 solderless terminals
(field-supplied). Connect the terminals (J)
3 Attach the remote control switch to the holding bracket. Be careful not to pinch the cable
when attaching it.
4 Remove the protection film from the liquid crystal display. (viii)
2
PMML0517 rev.0 - 02/2019
D - View from the bottom side
E - Rear cover
F - Notch for attachment of the controller
E- Lead the cable with its sheath peeled through the
groove
F- Peel the insulation at the end of the cable and
clamp the M3 solderless terminals (field-supplied)
(v)

Werbung

loading