s-MEXT-G00
1.4

OPERATING RANGE

Temperature with
wet bulb - °C
Temperature with dry bulb - °C
ROOM AIR CONDITIONS
Ambient air temperature:
14°C
minimum temperature with wet bulb.
22.5 °C
maximum temperature with wet bulb.
19°C
minimum temperature with dry bulb.
35°C
maximum temperature with dry bulb.
Room air humidity:
30%RH
minimum relative humidity.
60%RH
maximum relative humidity.
EXTERNAL AIR TEMPERATURE (dry bulb)
46°C
Maximum external air temperature
-5°C
Minimum external air temperature
-15°C
Minimum external air temperature with "wind baffle" installed
All the values are indicative. Operating temperatures are affected by many variables,
such as:
Operating conditions;
Cooling load;
Microprocessor control settings.
Piping length - distance between internal and external unit
POWER SUPPLY
± 10%
Maximum tolerance of the supply voltage (V)
± 2%
Maximum phase imbalance.
1.5

DESCRIPTION OF THE MAIN COMPONENTS

Electrical
Panel
Dirty filter
pressure
switch
Cooling connections
UM_s-MEXT_G00_01_Z_07_21_ML
Relative humidity - %
Machine
operating
area.
Wall bracket
Centrifugal fan
2

INSTALLATION

2.1

DISASSEMBLY OF THE MACHINE PANELS

DANGER
The machine panelling is made of heavy metal sheet.
All the assembly and disassembly operations must be carried out
using suitable means and by experienced individuals, trained and
authorised for these types of operations.
HINGED PANELS
Hinged panels can be easily removed to facilitate installation and / or maintenance operations.
Pin secured to the structure
Open the panel and lift the pin to remove it from the support hinge.
2.2
INSTALLATION
OBLIGATION
All the phases of installation must be covered in the general project.
Before starting these phases, in addition to defining the technical requirements, the person
authorised to perform the work must, if necessary, implement a "safety plan" to safeguard
the safety of the people directly involved, and strictly implement the safety rules and, in
particular, the laws that apply to mobile construction sites.
19
TRANSLATION OF THE ORIGINAL INSTRUCTIONS
English
Finned pack exchanger
Floor water
sensor
Removable hinge