Herunterladen Inhalt Inhalt Diese Seite drucken

Operation; Main Components Of The Appliance; Before Initial Operation - Pkm GK 225.4 A+EBN Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4. Operation

4.1 Main components of the appliance

1
Shelf freezing compartment
2
Thermostat / internal light
3
Glass shelves
4
Glass cover of crisper

4.2 Before initial operation

1. After installation, wait 4-6 hours before you connect the appliance to the mains
to allow the oil to flow back into the container.
2. Set the thermostat to position 3
3. Now let the empty appliance operate for 5 hours.
4. Use the freezer compartment 24 hours after initial operation of the appliance.
5. Clean the appliance thoroughly. Be very careful especially inside the appliance
(look at chapter
6. If the accessories inside the appliance are not fitted in their correct position,
replace them according to the image in chapter 4.
7. The appliance must be connected to the mains properly.
CLEANING AND MAINTENANCE
5
Crisper
6
Door trays
7
Bottle pocket
).
44

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis