10. Adjusting the Material Volume (Fig. 6)

Set the material volume by turning the regulator on the trigger guard of the spray gun.
- turn to the left
+ turn to the right 

11. Spray Technique

The spray result depends heavily on the smoothness and cleanliness of the surface to be
sprayed. Therefore the surface should be carefully prepared and kept free of dust.
Cover all surfaces not to be sprayed.
Cover screw threads or similar parts of the target object.
It is advisable to test the spray gun on cardboard or a similar surface to find the correct
setting.
Important: Begin spraying outside of the target area and avoid interruptions inside the
target area.
Correct (Fig. 7a) Be sure to hold the spray gun at an even distance of approx. 5 - 15 cm
to the target object.
Incorrect (Fig. 7b) Heavy spray fog build-up, uneven surface quality.
Move the spray gun evenly cross-wise or up-and-down, depending on the spray pattern
setting.
An even movement of the spray gun results in an even surface quality.
Wipe off the nozzle and air cap regularly to make sure they do not get blocked. (Fig. 8)

12. Interruption of Work till 4 Hours

Switch the unit off using the ON/OFF switch (Pos. 0).
Unplug the power plug.
When processing 2-component varnishes, clean the device immediately.
Always fold out the handle extension before
i
placing on the ground if you are using a
different spray attachment to the included
standard small spray attachment to balance
the container height.

13. Taking Out of Operation and Cleaning

Proper cleaning is the prerequisite for problem-free operation of the paint application
device. No warranty claims are accepted in case of improper or no cleaning.
1) Switch the unit off using the ON/OFF switch (Pos. 0). Vent the container in case of longer
breaks and after the work has been terminated. This can be done by briefly turning
open and then closing the container or by pulling the trigger guard and letting the
22
lower material volume
higher material volume