Herunterladen Inhalt Inhalt Diese Seite drucken

Panasonic WH-ADC0309K3E5 Installationshandbuch Seite 20

Luft/wasser-hydromodul + speicher
Vorschau ausblenden Andere Handbücher für WH-ADC0309K3E5:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 239
For optional pump.
Power supply: AC230V/50Hz, <500W
Recommended part: Yonos 25/6: made by Wilo
For optional mixing valve.
Power supply: AC230V/50Hz (input open/output close)
Operating time: 30s~120s
Recommended part: 167032: made by Caleffi
This section is for authorized and licensed electrician/water system
installer only. Work behind the front plate secured by screws
must only be carried out under supervision of qualifi ed contractor,
installation engineer or service person.
Network Adaptor 6 Installation (Optional)
1. Remove the Control Board Cover 5, then connect the cable
included with this adaptor to the CN-CNT connector on the
printed circuit board.
Pull the cable out of the Tank Unit so that there is no pinching.
If an Optional PCB has been installed in the Tank Unit, connect
to the CN-CNT connector of the Optional PCB.
2. Insert a fl at head screwdriver into the slot on the top of the
adaptor and remove the cover. Connect the other end of the
CN-CNT cable connector to the connector inside the adaptor.
Slot
20
WARNING
Connector
3. Pull the CN-CNT cable through the hole in the bottom of the
adaptor and re-attach the front cover to the back cover.
4. Fix the Network Adaptor 6 to Network Adaptor Holder.
Guide the cable as shown in the diagram so that external forces
cannot act on the connector in the adaptor.
Connection examples:
CN-CNT cable
Without Optional PCB
With Optional PCB
CN-CNT cable
(Take care not to
pinch the cable)
Network
Adaptor
Holder
CN-CNT cable
Network
Adaptor
Holder

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis