Herunterladen Diese Seite drucken

Leveransens Innehåll - Sungrow SH5.0RT Schnellinstallationsanleitung

Vorschau ausblenden Andere Handbücher für SH5.0RT:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 5
Scope of Delivery / Lieferumfang / Contenuto della fornitura / Contenu de la livraison /
Leveringsomvang / Zakres dostawy / Contenido suministrado / Âmbito
de entrega /
Leveransens innehåll
Inverter
AC/Backup connector set x 2
OT terminal *
WiNet-S module
Documents
* The images shown here are for reference. The actual product and quantity are based on delivery.
** SH5.0–10RT matches DTSU666 smart energy meters, and SH5.0–10RT-20 matches DTSU666-20 smart energy meters.
*** This accessory is only for SH5.0-10RT-20.The Australia and New Zealand region is equipped with 6 x 100A/0.333V CT as
standard, and the other areas are equipped with 3 x 100A/0.333V CT as standard.
Mounting location / Montageort / Luogo di montaggio / Lieu de montage / Montagelocatie /
Miejsce montażu /
parede /
Monteringsplats
Wall-mounting bracket *
Block (Optional)
or
Battery connector *
Smart Energy Meter**
Ubicación del montaje / Localização na
60 - (+140 /)
Expansion plug set x 4
Cord end terminal *
LAN connector
Current Transformer(CT)
×3 or 6***
-25 - (-13 /)
31
M4 screw set x 2
PV connector×2 or 3
COM connector
A
B
A
B
RS485 cable
0...100%

Werbung

loading