Overview of the steps to be taken and the maintenance report
No.
Step
1
Switch OFF the boiler, switch OFF the emergency stop switch
2
Close the gas supply valve,
3
Remove the casing and the combustion chamber housing
4
Pull the electrical connections off fan, sensors and electrodes
5
Remove the combustion chamber lid upwards
6
Clean the burner, if required
7
Clean the heating water heat exchanger
8
Clean the condensate pan
9
Clean the mixing chamber, if required
10
Refill granulate, if a neutralising system is installed
11
Refill granulate, if a neutralising system is installed
12
Refill granulate, if a neutralising system is installed
13
Check the protective anode every two years on enamelled cylinders.
14
Assemble the equipment
15
Clean and fill the siphon, install and check for tight fit
16
Descale the DHW heat exchanger, if required
17
Clean the DHW strainer
18
Check the expansion vessel in case of water loss
19
Open the gas supply valve and start the boiler
20
Gas soundness test
21
Flue gas soundness test
22
Check the ignition
23
Check the interaction with control accessories
24
Flue gas test in emissions test mode
25
Gross flue gas temperature
26
Ventilation air temperature
27
Net flue gas temperature
28
Carbon dioxide content (CO
29
or oxygen content (O
30
Carbon monoxide content (CO)
31
Flue gas loss
Confirm maintenance (company stamp, signature)
Date
54
Service Manual
)
2
)
2
Report item
Report item
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
°C
°C
°C
%
%
%
%
3044826_201602
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
°C
°C
°C
%
%
%
%