Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

3. INSTALLATION

> 100mm
The CAD HE 325/450/575 heat recovery unit is designed for indoor installation.
We recommend a min. temperature of >10ºC in the room where the unit is installed
to guarantee a good efficiency of the unit.
In areas where temperatures can be below -10º C in the winter time, it is
necessary to install a pre-heating device.
26
Ducts must be insulated and correctly
installed.
The U-bend is always to be filled
with water.

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Cad he 450 ec v basicCad he 575 ec v basic

Inhaltsverzeichnis