Herunterladen Diese Seite drucken

Steinbach 012610 Bedienungsanleitung Seite 9

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
EN
Basin assambling without floor isolation
Concrete slabs beneath the bottom rail connectors are not essential
for stability and stability and security reasons, their installation their
installation is recommended by us. Doing otherwise may lead to
subsidence, which subsequently may cause damage to the pool.
The concrete slabs have to be sunk flush with the installation area.
Figure
38,39,40
Installation of floor rails
Now connect the single floor rails with the bottom rail connectors.
Make sure that there stays a distance of about 1 cm beetween the
bottom
rail. Figure 41, 42
Check the measure
R,
the distance from the basin center to the
center of each bottom rail connecting piece, to make sure that your
pool is set up around. Figure
43
Mounting of the steel jacket
Unpack the coiled pool wall and place it vertically on a cardboard at
the center of the pool circle. The starting end of the wall must be po-
sitioned over a base plate, and the holes for the filter hoses should
be positioned where the pump and filter will be
clockwise completely over the entire length of the circle in the inner
profiles. Figure 13
Complete the circle, line up the holes in the two ends oft he pool wall
and join the ends with a bolt and nut through each head. The head
oft he bolts must be on the inner surface oft he wall, and the wash-
ers and nuts on the outer surface. There are two lines of holes on
the wall. It is important that each hole has a screw (except the last
one),
otherwise, the pool could break when filling. Recheck all of the
base plates to make sure each one are centered where the base
rails meet. Even make sure, that all lower profiles are set correctly.
Now you may cut to measure the last section with a hacksaw. For
this you only just need to lift the steel wall a little bit. Also do not
forget the plastic connectors.
Figure 14
Using a strip of PVC, cover the bolt heads on the inside of the pool
wall to protect the liner from rubbing against objects, which is the
main cause of tears in the liner (fig. 16). This tape must adhere
firmly, if it's necessary,
use
PVC glue. Stick the strip with glue for
PVC to insure that for instance the screws are completely covered
before moving on to the next step. Figure 15
Make sure that the swimming pool is completely circulare. Figure 16
If you use no floor insulation
Cover the inside bottom border of the circle using clean thin sifted
sand free of any stones or foreign objects with a height of 1 - 2 cm
and condense this. Press the sand into a vertical triangular shaped
layer that covers the sections and the inside part of the metal wall.
The height of this triangular layer must be around 7 cm. In this way,
you will prevent the liner from sliding under the metal wall and being
damaged due to the pressure and the weight of the water. To avoid
running away of the sand, you should install as shown below, in
addition a plastic sheet along the pelvic floor.
Figure 17
5)
chamfer
6)
tape
7)
platic film
8)
steel jacket
Figure 18
If you use floor insulation
Here you can use our optional Styrofoam wedges. These are glued
with an adhesive force on the round floor insulation along the pool
wall.
Alternatively, you can also make the furrow of sand.
Highline rund | 2016_V1
The wall is rolled
Regardless how you make the groove, you have to apply to the floor
insulation and the fillet a swimming fleece because otherwise the
bottom of the pool liner insulation deprives the plasticizers, the film
becomes brittle and thus significantly reduces the lifetime.
Installation of the swimming pool liner
The liner used has been developed to withstand exposure to heat
and ultraviolet rays for a long period of time.
Therefore, under certain climates and conditions of use, the liner
quality can vary slightly.
Never walk on the liner with shoes on.
The liner is the most important and delicate part of the swimming
pool. Do not use knives or any sharp objects to open the swimming
pool bag/container. Carefully separate the liner from the rest of the
parts and keep it in a safe place to avoid undesired holes or damag-
es that could be caused by the tools or the metal wall.
Install the liner on a sunny day, minimum 20º C, so that it can easily
stretch during the installation. It is made of a highly flexible vinyl ma-
terial.
7. Place the liner (L) in the center of the swimming pool and unfold it
towards the sides. Place the rough side towards the inside of the
pool. The welded part that joins the base of the liner with the side
must perfectly match the lower sections and the wall, all around
the inside perimeter at the bottom of the swimming pool. Figure 19
8. Locate the side welding so that it is perfectly right and perpendicu-
lar on the ground. This will help you to place the liner without folds.
9. Lift the side of the liner that covers the upper edges of the swim-
ming pool and fasten it to the top of the wall with clothespins. Re-
move the wrinkles by pulling smoothly outwards and adjust the lin-
er. Flatten the pool liner with your hands. Don't pull too hard. Figu-
re 20
10. It is very important, that the liner is centered, well extended and
not wrinkled. Start filling the pool with water, but not more than 2-3
cm and work out all the wrinkles and smooth the liner to the wall.
Dont't strech the liner too much. Now make sure the pool wal lis
level. If the level is off by more than 25 mm across the diameter of
the pool, empty the pool, take the wall apart and level the founda-
tions again. Figure 21
11.
Insert the U-profiles (Poolcoping) around the edges of the pool.
After the U-profiles are installed, cut the last profile to the
appropriate length.
Figure 22, 23
12.
Now install the white profiles
profiles PL. Leave a gap between the vertical pillars of + / - 10 mm
between the profiles
PCA. Figure 31,32
Installation of the decorative foil (optional)
Now put on the decorative film on the steel jacket and make sure
that there are no wrinkles.
Now you have to cut in the steel casing prepunched outlets for
skimmer and inlet ring all around about 2 inches larger.
Figure 25, 26
Mounting the vertical stay
4.
Insert the required vertical uprights on around the basin.
5.
Fit the vertical uprights into the ground rail connectors with 2 self-
tapping screws. The flaps of the connectors must be inside.
6.
Place the top plate on the pier, so that the flaps remain on the
inside of the post and secure it with 3 selfthreading screws. Make
sure that the pile is completely
Mounting of the hand rails
6.
Install a hand rail and position by first one of the ends over the top
of the plate. The side of the hand rails, which remains inside the
swimming pool, must be in the vicinity of the film or of the panel
and the wall of the
pool. Figure 35
7.
Align the holes out as shown. Secure it in place with 2 screws on
the top plate. Tighten the screws until all hand rails have been
installed at their place. Figure
8.
Repeat steps 1 and 2 with all the hand rails.
9. Form a perfect circle.
(PCA)
on the circumferential
vertical. Figure 33, 34
36
Page 9 of 50

Werbung

loading

Diese Anleitung auch für:

012614012612