Herunterladen Inhalt Inhalt Diese Seite drucken

Programme Sequence Display; End Of A Programme; Switching Off - Miele PFD 402 Gebrauchsanweisung

Gewerbegeschirrspüler
Vorschau ausblenden Andere Handbücher für PFD 402:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
en - Operation

Programme sequence display

Once a programme has started, the display
shows the programme name, the name of
the current wash phase and the time left un-
til the programme is finished.
Status
Time left
Universal
66°C
Programme parameters such as the actual
and target temperature can be queried dur-
ing a programme sequence.
To do this, tap the coloured bar in the
middle of the upper edge of the display
and swipe downwards.
66
08:15
0:45
h
Main wash 1

End of a programme

After a programme has ended normally, the
LED of the Start/Stop button will go out and
the following will appear on the display.
Programme completed successfully
In addition to this, a buzzer will sound for
approx. 3 seconds (factory default setting).
The buzzer is repeated three times every
30 seconds. To change buzzer settings, see
"Volume".
Tap to acknowledge the display.
If system messages are present, they are
displayed afterwards, e.g. if the salt con-
tainer level or the level of the liquid process
chemicals containers was low during the
programme, or when the next service is
due. Every message needs to be acknow-
ledged individually by pressing OK.

Switching off

Press the  button until the display turns
off.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis