Herunterladen Inhalt Inhalt Diese Seite drucken

Copyright; Before You Start; Switching On/Off; Setup/First Use - Silvercrest SDK 2500 C1 Bedienungsanleitung Und Sicherheitshinweise

Doppelkochplatten
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

WARNING about property damage
• Never place any objects on the hotplate.
• Only operate the hotplate on an even, stable and heat-resistant
surface.
• Never leave the hotplate unattended when in use.
• Disconnect the mains plug from the mains socket when the
hotplate is unattended.

5. Copyright

All the contents of this user manual are protected by copyright and provided to the reader for
information only. Copying data and information without the prior explicit written consent of the author
is strictly forbidden. This also applies to any commercial use of the contents and information. All texts
and diagrams are up-to-date as of the date of printing. Subject to change without notice.

6. Before you start

Remove the hotplate and all accessories from the packaging and check that the package contents are
complete. Remove any protective films. Keep the packaging material away from children and dispose
of appropriately.

6.1 Switching on/off

Switch the ON/OFF switch (4) on the side of the device to the "I" position to switch on the dual
hotplate.
Switch the ON/OFF switch (4) on the side of the device to the "0" position to switch off the dual
hotplate.
To switch the hotplates (1, 3) on, twist the relevant thermostat (5, 8) clockwise away from the
"MIN" position. The "MAX" position on each of the thermostats (5, 8) indicates the top heat
level. The relevant status indicator (6, 7) is on.
To switch the hotplates (1, 3) off, twist the relevant thermostat (5, 8) anticlockwise back to the
"MIN" position. The relevant status indicator (6, 7) goes out.

6.2 Setup/First use

Place the hotplate on a stable, flat, heat-resistant surface.
Connect the power plug to an easily accessible mains socket.
In order to remove any production residues, operate the hotplate for approx. 3 minutes at the
maximum temperature with no pan on it before using it for the first time. To do this, twist both
thermostats (5, 8) clockwise to the "MAX" position (maximum heat). Occasionally, smoke can
develop. If this happens, ensure there is sufficient ventilation by opening a window if necessary.
SilverCrest SDK 2500 C1
English - 11

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis