Herunterladen Inhalt Inhalt Diese Seite drucken

Assembling The Cabin; Assembling The Base Frame; Installing Wall Elements - Sentiotec HIMALAYA LARGE INFRA+ Montageanleitung

Massivsauna
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installations for instructions
3.

Assembling the cabin

ATTENTION!
The cabin is designed for both "left-hand" and "right-hand" assembly.
Please observe the floor plans on pages 8 and 9 in this regard.
Observe the figures starting on page 13.
The installation subsequently described is for the left floor plan.
For installation of the "right" floor plan – see Seite 15.

3.1. Assembling the base frame

With a hammer, carefully drive in the plastic dovetail keys on both corners of the
base frame until they are flush with the groove of the element.
Also screw the corners in place as shown.

3.2. Installing wall elements

A always designates the visible side, and appears on the top side of
the wall elements.
Start by installing the wall elements on the rear corners. The corner posts are
connected to the wall elements using Multiclips. Insert the corner post from above
down onto the wall elements. When doing so, make sure that the "Multiclips" are
aligned correctly. The corner post must be flush with the wall elements.
Installing the salt stone wall elements involves connecting them with the tongue
and groove and screwing them together. Pay attention to how the ventilation
element are positioned.
Install the salt wall lighting.
Now move the sauna to its final position and check the right angles (see tip on
page 4).
Install the side wall elements. Pay attention to how the electrical element are
positioned.
The "A/A wall element with the cutout for radiator" can be replaced with the "A/B
wall element with cutout for infrabox" – the external tongues will need to be
repositioned to do so.
Install the posts for glass using the "Multiclips".
p. 10/12

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Himalaya-l-ir+1-052-961

Inhaltsverzeichnis