aquonic | User Manual
FULLY AUTOMATED WATER TREATMENT PLANT FOR YACHTS AND HOUSEBOATS
Switch valves
Remineralization
INSTALLING THE REMOTE CONTROL SWITCH
The remote switch requires a drilled hole of 22mm. The
white switch unit can be removed by turning the selec-
tor level. Screw in the button and attach the switch in a
STARTING THE PLANT AND TEST RUN
The supply voltage may be attached if all connections
are correctly in place. Now turn the selector left to start
the rinse cycle, which causes the plant to be filled with
water. Continue by checking all connections for leaka-
ge and the drainage off board. After 5 min the rinse
cycle ends and the plant may be put into operation
38
way that turning the control button to the right will
start the plant. Turn the switch unit by 180° if necessa-
ry. If the numbers are in upright orientation, all is ok.
if no leakage was found. To start operating the plant,
turn the switch to the right until the blue control lamps
lights up. Check the pumps suction and make sure the-
re is water running off board soon after starting. The
pumps must not run dry for more than a minute.
Water inlet
of prepump
20 micron filter
5 micron filter
Carbon filter