51
Electrical installation
Version: CNX
Wiring scheme shower panels
CNX control cabinet
CONO140000 up to 64 fittings
CONO150000 up to 150 fittings
!
Topology up to max� 5
line segments with max�
64 or 150 fittings�
Max� 350 m cable
length per line segment�
Insert the cables into the shower panel from behind� Then observe the detailed descripti-
on of the wiring on the following pages�
Note!
electrical installation
Mandatory connecting cables are to be laid
and clamped on site in a thermowell / empty
conduit.
▪
The required cable types are specified in the corres-
ponding installation instructions:
Example: J-Y(ST)Y 2x2x0,8 mm²
Electrical wiring may only be carried out by a
qualified electrician in accordance with DIN VDE
105-100.
CONTI Sanitärarmaturen GmbH | Hauptstraße 98 | 35435 Wettenberg | Deutschland | Tel. +49 641 98221 0 | Fax +49 641 98221 50 | info@conti.plus
www.conti.plus | Druckfehler und Irrtümer sowie technische und maßliche Änderungen vorbehalten. | Errors and technical changes remain reserved.
An t 2
An t 1
SD-Card
SD-Card
AP
Rese t
Powe r
CNX
A B
C
Ethernet
Ethernet
USB
1
2
3
Cable type
J-Y(ST)Y 2x2x0,8mm
220
220