Herunterladen Inhalt Inhalt Diese Seite drucken

Technical Data; Operation - EINHELL RG-DP 1035 N Originalbetriebsanleitung

Schmutzwasserpumpe
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Anleitung_RG_DP_1035_N_SPK7__ 08.03.13 11:07 Seite 11
The equipment is not designed for continuous
operation, e.g. as a circulating pump in a pond. In this
case the equipment's anticipated life will be greatly
shortened because the equipment was not designed
for continuous loading.
The equipment is to be used only for its prescribed
purpose. Any other use is deemed to be a case of
misuse. The user / operator and not the
manufacturer will be liable for any damage or injuries
of any kind caused as a result of this.
Please note that our equipment has not been
designed for use in commercial, trade or industrial
applications. Our warranty will be voided if the
machine is used in commercial, trade or industrial
businesses or for equivalent purposes.

4. Technical data

Mains connection
Power rating
Max. pumping rate
Max. delivery head
Max. immersion depth
Delivery pressure max.
Max. water temperature
Hose connection
Max. size of foreign bodies:
Switching point height: ON
Switching point height: OFF
5. Before putting the equipment into

operation

5.1 Installation
The equipment can be installed either:
Stationary with rigid tubing
n
or
Stationary with a flexible hose line
n
Note:
The maximum pumping rate is possible only with the
largest possible line diameter; if smaller hoses or
tubes are connected, the pumping rate will be
reduced. If the universal hose connection (Fig. 1/Item
3) is used, it should be shortened (as shown in Fig. 2)
to the connection actually used in order not to reduce
the pumping rate unnecessarily. Flexible hoses must
be fastened to the universal hose connection with a
hose clip (not included in the scope of supply).
Note!
When installing, never hang the equipment by the
discharge line or by the power cable. The equipment
must be hung up with the provided carry handle or it
must rest on the bottom of the shaft. To ensure that
the equipment works properly, the bottom of the shaft
always must be free of sludge and other
accumulations of dirt. If the water level is too low, the
sludge in the shaft can quickly dry out and hinder the
equipment from starting. It is necessary therefore to
check the equipment regularly (carry out trial start-
ups).
Note:
The pump shaft should measure at least
40 x 40 x 50 cm so that the floating switch can move
freely.
The float switch is set to that it can be started
immediately.
230V ~ 50 Hz
1050 W
5.2 Mains connection
The equipment you have purchased comes with an
18.500 l/h
earthing-pin plug. The equipment is designed for
8 m
connection to a socket outlet with earthing contact for
230 V ~ 50 Hz. Make sure that the socket-outlet is
5 m
sufficiently fused (at least 6 A) and in good working
0,8 bar
order. Insert the power plug in the socket-outlet and
35 °C
the equipment is ready for operation.
ca. 47,8 mm (G1 1/2) IG
Important!
Ø 35 mm
To rule out danger, this work must be left strictly to a
max. approx. 60 cm
specialist electrician or Customer Service.
min. approx. 5 cm
6. Operation
You can put the equipment into operation after you
have thoroughly read the installation and operating
instructions. Pay attention to the following points:
n
n
n
n
n
n
Setting the ON/OFF switching point:
The ON/OFF switching point can be infinitely adjusted
with the height adjustment facility. For this purpose
Make sure that the equipment is set up securely.
Check that the discharge line is fitted correctly.
Make sure that the electrical connection is 230 V
~ 50 Hz.
Check that the electrical socket-outlet is in good
working order.
Make sure that no moisture or water can ever
reach the power connection.
Make sure that the equipment does not run dry.
GB
11

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

41.706.70

Inhaltsverzeichnis