Herunterladen Inhalt Inhalt Diese Seite drucken

Connecting And Installing The System - Dometic MPC01 Plus Montage- Und Bedienungsanleitung

Batteriemanagementsystem
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 25
MPC01 Plus
7

Connecting and installing the system

7.1
Notes on installation
When selecting the installation location for the display and control box, observe the following
instructions:
• The device must be installed in a location that is protected from moisture.
• Do not install the device in a dusty environment.
• The device must be installed on a level and sufficiently sturdy surface.
• Consider the control cable's length of 12 m.
• Install the control box in a well-protected location, close to the batteries if possible, to ensure
no objects can touch the connection cable and cause it to tear.
• Secure the connected cables using suitable fittings, e.g. cable clamps, to ensure the plug
cannot be torn from the circuit board.
7.2
Connecting and installing the display
You can install the MPC01 Plus on the wall or in the wall. For installation on the wall, the control
cable can either be guided through the wall or affixed on the wall.
Installing the display on a wall (fig. 3 A, page 4)
➤ Plug the control cable (1) into the connection on the display.
➤ Guide the control cable through the installation frame.
➤ Place the display in the installation frame.
➤ Affix the installation frame and display insert onto a suitable part of the wall using the four long
screws supplied.
➤ Attach the cover frame so that it latches into place.
Installing the display in a wall (fig. 3 A, page 4)
➤ Prepare a recess in the wall measuring 11 x 9.9 cm and which is 2.5 cm in depth.
➤ Plug the control cable (1) into the connection on the display.
➤ Affix the display using the four short screws supplied.
➤ Attach the cover frame so that it latches into place.
EN
Connecting and installing the system
13

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis