Herunterladen Inhalt Inhalt Diese Seite drucken

Transport Of The Air Curtain System; Transport Damage; Packaging; Scope Of Delivery - Teddington RONDO Originalbetriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

14 Transport of the air curtain system

14.1 Transport damage

Carefully inspect transport packaging for damage.
Carefully remove packaging.
With the help of the packing slip, check the system and the system components for
completeness and damage.
Document (photograph) any damage, note it on the haulier's paperwork and ask the driver
to sign this. Report the damage to Teddington immediately.
Reservations, such as "not inspected" or "accepted with reservations", will be equated with
acceptance free from defects.

14.2 Packaging

Packaging:
Your air curtain system is delivered on a pal-let (and optional accessories in a cardboard box
where applicable), sealed in film and fastened with straps.
Dimension:
length: depends on the length of the air curtain
width: 800 – 1,300 mm
height: 270 – 1,200 mm
net weight: from approx. 40 kg to 200 kg
Please note the precise data set out in the Technical Data chapter.

14.3 Scope of delivery

Your air curtain system
Pallet
Operating instructions of the air curtain system
Operating instructions of the control unit
Optional mounting material
Optional accessories
Stand 30.10.2019
Rough handling of the device during transportation can damage the fans, which
may result in a higher noise level and faster wear on the fan motors/bearings.
Check the centre of gravity of heavy weights!
Danger of buckling pallets during transport with forklift truck or lift truck.
32

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis