Herunterladen Diese Seite drucken

Kampmann Katherm HK Montageanleitung Seite 7

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
5
Pre-commissioning checks
Before initial commissioning, check whether all the necessary conditions have been met so that
the unit can function safely and properly.
Electrical tests
Check whether all lines have been properly laid.
Check whether all lines have the necessary cross-section.
Are all wires connected in accordance with the electric wiring diagrams?
Is the earth wire connected and wired throughout?
Check all external electrical connections and terminal connections are fixed in place and
tighten if necessary.
Check whether DIP switches have been correctly set in accordance with the wiring diagram.
Water-side checks
Check whether all supply and drainage lines have been properly connected.
Fill pipes and unit with water and bleed.
Check whether all bleed screws are closed.
Check leak tightness (pressure test and visual inspection).
Check whether the parts carrying water have been flushed through.
Check whether any shut-off valves fitted on site are open.
Check whether any electrically actuated shut-off valves have been properly connected.
Check whether all valves and actuators are working properly (note permitted mounting pos-
ition).
Condensation water connection
Check whether the condensation tray is free of building rubble.
Check the condensation drain and operation of the alarm signal on the condensation pump.
Check whether the cooling valve switches off in the event of an alarm signal.
Check whether the unit is connected leak-free to the on-site condensation connection.
Check whether the waste water lines are clean and have a sufficient gradient.
Check whether the condensation pump has a working power supply.
6
Cleaning the condensate tray
1
4
4
2
Remove the grille
1
.
Remove the cover plates
2
.
Loosen the clip from the condensate elbow and remove the condensate elbow from the drain
3
connection of the condensate tray
Loosen the segment panel screws and the segment panels
of the floor trench.
Remove the motor connection plug from the tangential fan.
Remove the tangential fan from the fixing bolts
Loosen the screws of the central wall
Pull the condensate tray arranged below the condensate tray
trench. Note: The condensate tray cannot be removed!
Use a damp cloth to clean the condensate tray
with a dry cloth.
After cleaning the condensate tray, refit the parts in reverse order to dismantling them.
Katherm HK
Assembly instructions
2
4
6
3
5
5
7
.
4
from the brackets on the walls
5
6
of the central wall
.
6
and remove the central wall from the trench.
7
to the room side of the
7
and then wipe away any damp patches
7

Werbung

loading