Herunterladen Inhalt Inhalt Diese Seite drucken

ATH-Heinl 2.32H2 Betriebsanleitung Und Prüfbuch Seite 65

Zweisaulen-hebebuehnen
Inhaltsverzeichnis

Werbung

Protocol / Function and visual safety check
Location
_________________________
_________________________
_________________________
Regular check
Further operation harmless, no defects at time of checking
Following defects are detected:
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Further operation possible, defects must be repaired
Further operation risky, check-over necessary
(Tick where applicable.If check-over is needed, tick additionally)
1) The operatior certify that the floor comply with the specifications according to the operation manual
Check carried out
______________________________
Place,Date, Name of technical expert
Notice of defects
Defects repaired on the _________
All manuals and user guides at all-guides.com
65
(VBG14/BGR500)
Initial operation check
⇒ ⇒ ⇒
⇒ ⇒ ⇒
Lift
Producer
ATH
Type/Model
_________________________
serial n˚/
production year _________________________
Check-Over
______________________________
Company stamp/Signature technical expert
______________________________
Company stamp/Signature client/operator
______________________________
Company stamp/Signature client/operator

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

2.32hl22.42h22.2hl2

Inhaltsverzeichnis