Herunterladen Diese Seite drucken

Ferroli ECOGEO H 1P B 200 Anweisungen Für Montage Und Instandsetzung Seite 10

Speicher

Werbung

Attenzione:
I materiali impiegati possono subire deformazioni a causa di oscillazioni di temperature; vi raccomandiamo
di conservarli in ambienti coperti ed a temperature miti ( 15÷20 °C).
ENG SOFT INSULATION:
TF = Plastic upper-cover
DS = Insukation disk 8soft polyurethan)
IS = Insulation jacket in two parts
CL = Zip fastener
RS = Plastic washer
Instructions for assembling:
1. The insulation jacket has to be leaned around the cylinder payng attention to coincide the arranged
holes with the connections.
2. Put the suitable plastic washer.
3. Close the zip fastenerleaning the 2 parts of the insulation jacket.
4. Put the insulation disk DS on the top.
5. Set up the plastic cover TF with care.
Please to remark:
The insulation jacket consist of materials wich are subjected at dilation or restriction owing to
swinging of temperatur – We recommand to keep yhen by temperatur of 15 – 20 °C.
10
I ISOLAMENTO MORBIDO:
TF = Coperchio superiore
DS = Disco isolamento
IS = Isolamento diviso in 2 o più parti
CL = Cerniera lampo
RS = Rosette di finitura
Assemblaggio:
1.
in modo che i fori dell'isolamento "IS" e i
manicotti del boiler coincidano.
2.
"RS" adatte.
3.
di facilitare la chiusura tenendo vicini i due lembi
dell'isolamento "IS" e spingendoli verso il boiler.
4.
da pareggiarlo con l'isolamento "IS".
5.
non rovinare l'isolamento "IS".
cod. 3542A490 - Rev 00 - 11/2021
ECOGEO H 1P B
Stendere le due parti dell'isolamento "IS"
Fissare l'isolamento "IS" con le rosette
Chiudere le due cerniere "CL" avendo cura
Inserire il disco isolamento "DS" in modo
Mettere il coperchio "TF" avendo cura di

Werbung

loading

Diese Anleitung auch für:

Ecogeo h 1p b 300Ecogeo h 1p b 500