Herunterladen Diese Seite drucken

Miele PTD 901 Anschlussplan Seite 7

Vorschau ausblenden Andere Handbücher für PTD 901:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Location of connections on the machine
Item
Name
A
Connection for drain hose
TWW
Water connection G ¾"
EZ
Entry for mains cable (inside the machine approx. 1.7 m is needed for laying and connecting the mains cable)
LAN
Socket RJ45 for patch cable CAT.7 (optional)
PPE
Connection for on-site equipotential bonding system
DOS1
Connection for rinse aid hose
DOS2
Connection for detergent hose
ext. DOS
Connection for external dosing devices
DT / RA
Connection for suction tubes (DT: detergent / RA: rinse aid)
ext. EM
Connection for external energy management system
Accessories
flexible inlet water hose; connect to point
TWw
G 3/4"
1500 mm
Suggestion for the on-site installation points
The exact dimensions must be determined, taking into consideration the local conditions. The dimensions of the machine can be found
on page 1.
Subject to technical alterations
flexible drain hose; connect to point A
G 3/4"
1500 mm
Dirt trap; install between the water stop cock
and the inlet water hose
|
|
12020530; 2021-09
G 3/4"
G 3/4"
7

Werbung

loading

Diese Anleitung auch für:

Ptd 901 liftPtd 901 ecoPtd 901 lift eco