Herunterladen Inhalt Inhalt Diese Seite drucken

dB Technologies VIO W15T Bedienungsanleitung Seite 27

Aktiver 2-wege-bühnenmonitor in koaxialem design
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 36
English
CONNECTING AND LINKING THE POWER SUPPLY
On the VIO W15T you can link the power supply from the first monitor to the next, up to a total of 5 (1+4) in
countries with a 220-240Vac mains supply and 4 (1+3) in countries with a 100-120Vac mains supply.
To link the power supply in this way, simply connect the power cable supplied to the MAINS INPUT on the first VIO
W15T and connect a second cable with suitable connectors (optional) between the MAINS LINK output and the
MAINS INPUT of the next VIO W15T. This type of connection can be repeated up until the maximum permissible
current is reached and indicated in the MAINS LINK connector of the first monitor.
POWER CABLE
RDNET CONNECTIONS
To enable remote control, connect the Data Input of the first monitor to the hardware interface (RDNet Control
2 or RDNet Control 8) using cables fitted with ethernCON connectors. Then connect the Data Output of the first
monitor to the Data Input of the second, and so on. When the monitors are powered on, the Link LEDs illuminate
to indicate the connection has been made. The other Active LEDs will start flashing to indicate the presence of
data traffic.
RDNET
CONTROL
VIO W15T
Cod. 420120335 REV. 1.0
27

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis