Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
EN
28

INSTALLATION

Note: The specified values are [mm].
Vertical line
Wall Drilling and Bracket Fixing
As a first step, proceed with the following drawings:
• A vertical line up to the ceiling or up to the upper limit, at the center of the area in
which the hood is to be fitted.
(A) A horizontal line A at 980 – 1080 mm above the cooker top.
(B) A horizontal line B at a X mm above the horizontal line A.
(C) A horizontal line C at a 190mm below the horizontal line A (only valid
for „Solution 2").
Option
Chimney
1
400+0
2
400+300
3
400+390
4
500+490
X
/
390-620
390-710
490-910

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis