Herunterladen Inhalt Inhalt Diese Seite drucken

Dispensing; First Operation; Filling And Refilling The Product Reservoir - Loctite Rc18 Bedienungsanleitung

Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

5

Dispensing

5.1

First Operation

• Check that the dispensing valve is connected correctly according to the operating
manual.
• Switch the power switch 5 to position I (ON).
Notice
When you switch on the dispenser 97009 an empty signal with a peeping tone is
indicated.
This will happen because there is no product bottle in the reservoir.
5.2

Filling and Refilling the Product Reservoir

Warning!
Never fill the product directly into the reservoir!
The pneumatic and safety devices would become clogged and therefore ineffective!!
When dispensing cyanoacrylate and an empty signal is shown (only 97009), refill the
product reservoir immediately, since air in the product line results in curing of the
product! The dispensing can be further started.
Before loosening the reservoir knobs 2, the reservoir must be depressurized (pressure-
free)!
The reservoir is depressurized when the depressurizing valve 10 is in
pressure gauge 13 indicates no pressure.
• Loosen the reservoir knobs 2 and
remove the lid 1.
Caution!
Product residue on the product
feedline!
Do not contaminate the product
feedline with dust or moisture!
• Place the lid 1 on the drip funnel.
• Check that there is no condensed
moisture at the bottle or the sensor surface.
• Place the bottle in the bottle-nesting
block 14.
• Check that the product bottle inserted
in the bottle-nesting block 14 is
pressed again the level sensor.
• Insert a full product bottle in the
reservoir.
• Check that the product bottle inserted is pressed against the level sensor.
Caution!
If there is a gap between the bottle and the sensor, the sensor has to be adjusted.
The adjustment should be done by authorized service personal only, see section 8.
• Insert the product feedline into the bottle and put on the lid 1.
• Uniformly tighten the reservoir knobs 2 by hand.
• Set the depressurizing valve 10 to position
12
(pressurize).
position and

Kapitel

Inhaltsverzeichnis

Fehlerbehebung

loading

Diese Anleitung auch für:

97009

Inhaltsverzeichnis